Maintenance

Our company carries out first opening overhaul as well as regular seasonal maintenance of the pools.

First Opening Overhaul: This is the maintenance carried out in order to prepare the pool for the season. The following applications are made within this framework.

The pool is full emptied and its walls, floor and sluiceways and sunbathing area are cleaned with water pressurized at 150 bars and accompanied with the acid solution.

Engine room and balance tank are cleaned.

Coatings inside the pool, ceramics of the sluiceways and grout of the balance tank are controlled and if necessary, silicone grout sealer is applied.

After application of silicon grout, dried is removed with the help of scraper machine.

Equipment of electrical installation are cleaned and are taken care of and missing items are replaced.

Leakages in the mechanical installation are eliminated.

Sand filter is opened up and sand is controlled, any shortage is completed if necessary it is renewed altogether.

Engine maintenance is carried out.

Grates of sluiceways are controlled and changed if eroded.

Lamps and transformers in the pool area are controlled.

Pool and the balance tank are filled with clean water.

After Ph value in the pool is measured, the pool is shocked with chlorine.

Seasonal Maintenance of the Pool: The pool is chemically maintained from April until the end of October. It consists of following operations.

Chlorine and Ph values are tested.

Pool’s flour is cleaned.

Filtration pump is daily cleaned.

Daily, sand if filtered and backflushing is done.

Daily engine control is done.

Leaves in the sluiceways are removed.

Note: for more detailed information, you can reach us through our e-mail address.